A full bathroom renovation costs roughly €4,000 – €7,500 on a budget, €9,000 – €16,000 in the mid-range and €20,000 – €35,000 or more at the high end for a typical 5 m² bathroom. These are rough European ranges, and prices vary by country: the same job can cost half as much in Portugal or Poland as in Germany, the Netherlands or Ireland. What stays constant is the structure of the bill, and that is what this guide breaks down.
It covers a real renovation, with tiles off and pipes exposed. If the tile is sound and you only want the room to look different, read bathroom redesign ideas that don’t involve retiling first.
Three tiers at a glance
| Tier | What you get | Rough total (5 m²) |
|---|---|---|
| Budget | Same layout, standard ceramic tile on the floor and wet walls, paint elsewhere, basic sanitaryware, bath or shower tray kept in position | €4,000 – €7,500 |
| Mid-range | Full strip-out, new pipework to existing positions, porcelain tile, wall-hung toilet, walk-in shower with glass screen, vanity unit, new lighting | €9,000 – €16,000 |
| High-end | Layout changes, large-format or natural stone tile, underfloor heating, built-in niches, concealed thermostatic fittings, bespoke vanity | €20,000 – €35,000+ |
Line items by tier
| Line item | Budget | Mid-range | High-end |
|---|---|---|---|
| Strip-out and disposal | €200 – €500 | €600 – €1,100 | €1,000 – €1,800 |
| Plumbing first and second fix | €700 – €1,300 | €1,500 – €2,800 | €3,000 – €6,000 |
| Electrics, lighting and fan | €300 – €600 | €600 – €1,200 | €1,500 – €3,000 |
| Walls and floor preparation | €200 – €500 | €600 – €1,200 | €1,200 – €2,500 |
| Waterproofing | €150 – €350 | €300 – €600 | €500 – €1,000 |
| Tiles, supplied and laid | €1,200 – €2,000 | €2,200 – €3,800 | €5,000 – €9,000 |
| Toilet (and frame, if wall-hung) | €200 – €400 | €600 – €1,100 | €1,200 – €2,500 |
| Basin and vanity | €250 – €500 | €600 – €1,400 | €2,000 – €4,500 |
| Shower or bath, with screen | €400 – €800 | €1,200 – €2,500 | €3,000 – €6,000 |
| Taps and shower fittings | €200 – €400 | €500 – €1,100 | €1,500 – €3,500 |
| Heating (towel rail, underfloor) | €150 – €300 | €300 – €700 | €1,000 – €2,200 |
| Mirror, accessories, paint | €100 – €250 | €300 – €600 | €800 – €1,800 |
| Contingency | 10 % | 15 % | 15 – 20 % |
How to read the lines that move most:
- Plumbing depends on distance, not fittings. Reconnecting to existing positions is a day or two. Moving the toilet is the expensive move: its 110 mm waste pipe needs a fall of 1 – 2 cm per metre, so a move of 2 m can mean raising the floor or cutting a channel.
- Tiling is priced per m² of surface, and a small room has a lot of it. A 5 m² bathroom with a 2.4 m ceiling has about 20 m² of wall. Fitted prices run from roughly €60 per m² for budget ceramic to €170 or more for large-format porcelain; the full table, with layouts and grout, is in bathroom tile ideas.
- Waterproofing is the cheapest line and the one that matters most. A liquid or sheet membrane under the tile in the shower area and across the floor costs €15 – €35 per m². It is invisible when done and very expensive when it is not.
- A wall-hung toilet needs a frame and a boxed-in wall, which adds €300 – €600 over a floor-standing one, plus 12 – 20 cm of depth.
Where the money goes
Labour is typically 50 – 60 percent of a bathroom bill, because five or six trades each need at least a day in a room where only one can work at a time. That is also why a small bathroom is not proportionally cheap: a 3 m² room saves a few square metres of tile and nothing else. The ideas in small bathroom ideas make a compact room work better, but expect the total to fall by about 10 – 20 percent against a 5 m² room, not by half.
A rough split for a mid-range job:
- Plumbing and electrics: 20 – 25 percent
- Tiling, preparation and waterproofing: 25 – 35 percent
- Sanitaryware, fittings and furniture: 25 – 30 percent
- Strip-out, decoration and contingency: 15 – 20 percent
What pushes the price up
- Moving the toilet or the drain. Keep the waste positions and the budget tier is still within reach.
- A level-access shower. The drain has to sit lower than the floor around it, with a fall of about 2 percent towards it. On a timber floor that is manageable; in a concrete slab it means cutting in or raising the whole floor by 4 – 8 cm.
- Tile format. Tiles of 120 × 60 cm and larger need flatter walls, two people to handle and more cutting waste. Small mosaics take longer to lay and grout.
- Concealed fittings. In-wall thermostatic valves and cisterns look clean, cost two to three times as much as exposed ones and need access planned for repairs.
- What is behind the tiles. Old galvanised or lead pipework, a rotten floor under the bath or unprotected wiring all have to be fixed once found. This is the main reason for a contingency of 15 percent, as our home renovation budget guide argues.
A worked example: 5 m² bathroom, mid-range
A 2.0 × 2.5 m bathroom in a 1980s flat. The bath comes out and a 90 × 120 cm walk-in shower goes in its place, using the same waste position. Toilet and basin stay where they are.
| Line | Amount |
|---|---|
| Strip-out and disposal | €800 |
| Plumbing: new supply pipes, shower drain, reconnecting toilet and basin | €2,100 |
| Electrics: ceiling spots, mirror light, timer fan | €850 |
| Wall repairs and levelling screed | €800 |
| Waterproofing: floor and shower walls, about 12 m² | €400 |
| Porcelain tile: 5 m² floor, 14 m² wall, fitted | €2,700 |
| Wall-hung toilet with frame | €850 |
| Vanity unit, 80 cm, with basin | €900 |
| Shower tray, glass screen, thermostatic mixer | €1,900 |
| Basin tap and accessories | €350 |
| Electric towel rail | €350 |
| Painting of untiled walls and ceiling | €300 |
| Subtotal | €12,300 |
| Contingency, 15 % | €1,845 |
| Total | €14,145 |
Keeping the floor-standing toilet and tiling only the shower walls and floor, with paint elsewhere, would bring this to about €11,000. Moving the toilet to the opposite wall would add roughly €1,000 – €2,500, depending on the floor.
How to save without regretting it
- Keep the layout. It is the single largest saving and costs nothing in quality.
- Tile where water goes, paint the rest. Full height in the shower, 120 cm behind the basin and toilet, moisture-resistant paint above. The numbers for the painted part are in what it costs to paint a room.
- Spend on what is inside the wall, save on what hangs on it. A mirror, a towel rail or a vanity can be upgraded in an afternoon later. A valve behind tile cannot.
- Choose standard sizes. Shower trays of 80 × 80, 90 × 90 and 80 × 120 cm and vanities of 60, 80 and 100 cm are stocked everywhere; odd sizes carry a premium and a wait.
- Do the strip-out and painting yourself, if you are able and the building allows it. DIY vs hiring a contractor is honest about where that stops.
Common mistakes
- Comparing quotes that cover different things. One includes disposal, waterproofing and making good; another does not. Ask for the same line items from each firm.
- Choosing tile before checking the walls. Large tiles on uneven walls mean extra preparation that appears as a variation halfway through.
- No extractor fan upgrade. A new bathroom with the old, weak fan grows mould in the new grout within a year.
- Skipping drying times to finish sooner. Screed, membrane and adhesive all need their stated hours. A tiler who offers to do it all in two days is skipping one of them.
- No plan for the weeks without a bathroom. In a home with one bathroom, agree with the contractor on which day the toilet goes back in. The renovation checklist to run before you start lists what to arrange in advance.
- Deciding the look on site. Settle the tile, vanity and fittings before work starts. A photo of the current room in Homie’s Room Redesign lets you compare directions quickly; treat it as a visualisation to brief trades with, not a drawing.
Getting a number for your own bathroom
Measure the floor and the wall area to be tiled, note which fixtures move, and list the fixtures you want. For a first figure before calling anyone, a renovation cost estimate from a photo gives a range for a specific design. Then get three itemised quotes. If you are doing the kitchen in the same year, book the same plumber and electrician for both: the kitchen renovation cost breakdown follows the same structure, and renovating in phases explains which room to do first.